Basic brickwork replacement
Contents |
[edit] Introduction
Replacing faulty or decayed brickwork can be a difficult process, but simple projects may only require these steps.
[edit] Preparations
Cut away the damaged brick, clean out the hole completely and make sure no dust remains. Gently douse the newly created void with water, making sure to include the top and sides of the recess. Include the surrounding brickwork as well.
Fit the replacement brick into the space that has been created. It should fit easily into the hole, with sufficient space for mortar to surround it. Remove the brick and trim away some of the bottom bed edge so it looks like a slightly truncated wedge.
Cover the underside of the top brick with mortar for the top bed-joint. Some will naturally fall onto the bottom surface of the recess. This should be spread across the sides and bottom to form the cross joints and bed joint.
[edit] Positioning and placing
Take the replacement brick, cover all of it (except the face) with a coat of mortar, place it into the hole and then drive it in gently but firmly with the end of a brick hammer. Additional pressure may be applied by using a small piece of wood and a lump hammer. It is important to keep the brick level during this process; otherwise, it will be difficult to straighten it and the surface will not be flush.
When the brick is pushed into place, extra mortar will be forced out. This should be removed with a trowel.
Once the brick is driven into the proper position, some of the mortar should be left projecting from the joint. Once the extra mortar begins to stiffen, it can be pushed back into the joint with the edge of the trowel. This should solidify the joint and help to make the repaired brick a more integral part of the wall.
[edit] Related articles on Designing Buildings
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.























