Basic brickwork replacement
Contents |
[edit] Introduction
Replacing faulty or decayed brickwork can be a difficult process, but simple projects may only require these steps.
[edit] Preparations
Cut away the damaged brick, clean out the hole completely and make sure no dust remains. Gently douse the newly created void with water, making sure to include the top and sides of the recess. Include the surrounding brickwork as well.
Fit the replacement brick into the space that has been created. It should fit easily into the hole, with sufficient space for mortar to surround it. Remove the brick and trim away some of the bottom bed edge so it looks like a slightly truncated wedge.
Cover the underside of the top brick with mortar for the top bed-joint. Some will naturally fall onto the bottom surface of the recess. This should be spread across the sides and bottom to form the cross joints and bed joint.
[edit] Positioning and placing
Take the replacement brick, cover all of it (except the face) with a coat of mortar, place it into the hole and then drive it in gently but firmly with the end of a brick hammer. Additional pressure may be applied by using a small piece of wood and a lump hammer. It is important to keep the brick level during this process; otherwise, it will be difficult to straighten it and the surface will not be flush.
When the brick is pushed into place, extra mortar will be forced out. This should be removed with a trowel.
Once the brick is driven into the proper position, some of the mortar should be left projecting from the joint. Once the extra mortar begins to stiffen, it can be pushed back into the joint with the edge of the trowel. This should solidify the joint and help to make the repaired brick a more integral part of the wall.
[edit] Related articles on Designing Buildings
Featured articles and news
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.
Setting Expectations on Competence Management
Industry Competence Committee.
New Scottish and Welsh governments
CIOB stresses importance of construction after new parliament elections.
The sad story of Derby Hippodrome
An historic building left to decay.
ECA, JIB and JTL back Fabian Society call to invest in skills for a stronger built environment workforce.
Women's Contributions to the Built Environment.
Calls for the delayed Circular Economy Strategy
Over 50 leading businesses, trade associations and professional bodies, including CIAT, and UKGBC sign open letter.
The future workforce: culture change and skill
Under the spotlight at UK Construction Week London.
A landmark moment for postmodern heritage.
A safe energy transition – ECA launches a new Charter
Practical policy actions to speed up low carbon adoption while maintaining installation safety and competency.
Frank Duffy: Researcher and Practitioner
Reflections on achievements and relevance to the wider research and practice communities.
The 2026 Compliance Landscape: Fire doors
Why 'Business as Usual' is a Liability.
Cutting construction carbon footprint by caring for soil
Is construction neglecting one of the planet’s most powerful carbon stores and one of our greatest natural climate allies.





















